How to Set Up a Healthcare Facility in Dubai: A Step-by-Step Guide

How to Set Up a Healthcare Facility in Dubai: A Step-by-Step Guide

How to Set Up a Healthcare Facility in Dubai: A Step-by-Step Guide

Starting a healthcare facility in Dubai can be a good choice because the city's population is growing and there's a big need for high-quality medical care. Setting it up needs thoughtful planning, sticking to strict guidelines, and getting multiple approvals.

1. Define Your Business Model and Services

Decide first what kind of medical center you wish to build.  Will it be a hospital, day surgery center, diagnostic lab, general clinic, or specialty medical center?  Every alternative has different costs and licensing requirements.

Early service clarification will aid in staffing, facility design, and financial planning. Make sure your company plan complies with Dubai's healthcare investment requirements if you intend to diversify into several healthcare verticals.

2. Choose the Right Legal Structure

In Dubai, you can set up your facility under:

  • Mainland (Dubai Department of Economic Development license)

  • Free Zone (such as Dubai Healthcare City)

  • Offshore (not permitted for direct patient services)

Most healthcare investors like Dubai Healthcare City (DHCC) because it has easy processes, top-quality facilities, and a strong medical environment. The way you organize your business can change how much control you have, the taxes you need to pay, and how easy it is to adjust your business activities.

3. Reserve Your Trade Name and Get Initial Approvals

Reserve your trade name with the relevant authority, followed by initial approval for your chosen business activity from the Dubai Department of Economic Development or Free Zone authority. This confirms your business activity is permitted and allows you to proceed with detailed setup steps.

4. Secure DHA Facility Design Approval

The Dubai Health Authority (DHA) is in charge of all healthcare places in Dubai. You need to send your facility's design and layout for approval before you start building or setting it up. Designs should comply with DHA guidelines covering:

  • Minimum space per speciality

  • Clearly defined reception, consultation, and treatment areas

  • Accessibility for people of determination

  • Infection control and patient safety measures

Not following the rules may cause problems like delays or rejections. If you require assistance in planning compliant designs and documentation, We are offering specialised healthcare facility setup and management services to simplify this stage.

5. Find a Strategic Location

Select a location based on:

  • Proximity to residential and business areas

  • Patient accessibility

  • Availability of parking

  • Compliance with zoning and DHA regulations


The right location improves patient convenience and business sustainability. If you are setting up a multi-speciality clinic or medical centre, consider accessibility for various patient segments including families, corporates, and tourists.

6. Complete Fit-Out and Interior Construction

Once you receive design approval, start the fit-out phase. Key considerations include:

  • Using medical-grade materials

  • Installing compliant electrical, plumbing, and ventilation systems

  • Ensuring fire safety and emergency exits meet UAE standards

Regular site inspections during fit-out help maintain compliance and avoid rework.

7. Book DHA Final Inspection

After construction is complete, book a DHA final inspection. Inspectors will verify:

  • Compliance with approved design

  • Installation and calibration of medical equipment

  • Hygiene and operational readiness


Passing this inspection grants you your facility license, allowing you to begin operations.

8. Recruit Licensed Medical Professionals

All staff, including doctors, nurses, and technicians, must hold valid DHA licenses. Each professional will require:

  • Verified qualifications via Primary Source Verification (PSV)

  • Passing DHA exams if applicable

  • Valid malpractice insurance

Business Heads also supports clients with DHA, MOH, and DOH licensing services to ensure your team is compliant before launch.

9. Obtain Your Trade License

Once you have your DHA facility license and tenancy contract, apply for your trade license with the Dubai Department of Economic Development or the Free Zone authority. This license legally permits your facility to operate.

If you are expanding your business portfolio, you can also explore PRO and document clearance services offered by Business Heads to streamline your corporate compliance requirements.

10. Launch and Maintain Operations

With all licenses and staff in place, you can launch your facility. To maintain standards:

  • Schedule regular internal and DHA compliance audits

  • Conduct ongoing staff training

  • Renew licenses on time

  • Optimise operational management for better patient outcomes

Why Work with Healthcare Setup Consultants?

Establishing a healthcare facility in Dubai is a highly intricate process with minimal room for error. Having seasoned consultants on board guarantees your approvals, designs, licensing, and management processes are well taken care of. You can therefore concentrate on providing quality medical services to your patients from day one.